Executive Solution Overview
[>Civil Engineering homework help](https://www.sweetstudy.com/fields/engineering-civil-engineering) ## SEE FORMAT REQUIRED BELOW ## Part I: Construction Cost Management (45%) 1. Using the information provided in **Week 11, Resources, and Lecture 11-Part 5 (Square foot and Assembly Estimation video. …
Instant Solution Download
$6.99Immediate access to the full model answer, formatted citations, and rubric breakdown.
Need a Fresh Custom Paper?
Have this question answered from scratch according to your specific instructions and deadline.
Order on TutorsGallery →Assignment Prompt & Instructions
[>Civil Engineering homework help](https://www.sweetstudy.com/fields/engineering-civil-engineering)
## SEE FORMAT REQUIRED BELOW
## Part I: Construction Cost Management (45%)
1. Using the information provided in **Week 11, Resources, and Lecture 11-Part 5 (Square foot and Assembly Estimation video. See chart on slide within the first 4 minutes)**, using the chart, and square feet costs shown by building type, perform a square foot estimate to find the cost of a 150,000 S.F. college dormitory. (10%) (show calculation)
2. If the cost you estimated in question 1 is for a college dormitory at Clemson University in 2016, what would be the cost of a similar building at Auburn University in 2016? (15%) (show calculation)
3. What is the difference between “construction cost estimating” and “construction cost control”? **Be specific (from lecture).** (10%)
4. Identify whether each of the following items should be categorized as **direct costs** or **indirect costs** in a construction project. (10%)
• Labor expenses for on-site carpenters
• Rental fees for construction equipment like a small loader
• Architectural design fees
• Office rent and utilities
• Concrete and rebar used in the building's foundation
• Workers' compensation insurance
• Safety equipment for on-site workers
• Administrative salaries for project managers
• Temporary protection of flooring
• Material invoice of roofing membrane
## Part II: Construction Time Management (55%)
1. Identify which definition is for **"planning"** and which is for **"scheduling"**. (10%)
– —— is the detailed process of creating a timeline or calendar that specifies when and in what order specific tasks or activities should be completed to meet the project's objectives. It's the day-to-day roadmap for executing the plan.
– —— involves setting project goals, defining the scope, and deciding what needs to be done and when. It's about determining the big picture and organizing resources.
2. What is a Work Breakdown Structure (WBS)? **AND** Why is it needed? (Two-part question). (10%)
3. Arrange the following steps required for planning a construction project in the correct order, and provide a brief description for each step. (From lecture, not general answer) (15%)
– Identify the sequential relationships between the activities
– Identify the activities (tasks) needed to complete the project
– Breakdown the project into elements or items of work
– Continue refining the plan to improve efficiency
4. How do we shorten or accelerate the duration of a construction project, when needed? Be specific. ( **From lecture)**(10%)
5. **LIST** and briefly describe the DATA that needs to be collected to keep a construction schedule updated. **(From lecture)** (10%)
**FORMAT:**
Header: Your Name, Course BCN3027, Assignment 2
PART 1 and 2 Re-state the question, then provide the answer Example:
– Question:
– Answer:
**No Page Limit**
Submit in PDF format
https://www.youtube.com/watch?v=sC1xy1F6I2Q
– [\
\
Module9-Estimating.pdf](https://www.sweetstudy.com/files/module9-estimating-pdf "Module9-Estimating.pdf")
Leave a Reply