➤ How should I present ETC in a status report with these numbers?
State the chosen method (e.g., CPI-based), show the calculation: ETC = (92 − 69.7)/0.93 ≈ 23.98 and EAC = ACWP + ETC ≈ 98.98. Report CPI = 0.93, CV = EV − ACWP = −5.3 and note assumptions. Recommend corrective actions or a bottom-up re-estimate if needed.
Leave a Reply