A highway weigh station can inspect an average of 16 trucks per hour. Trucks arrive at the average rate of 10 trucks per hour. Performance is described by an M/M/1 model. What is most nearly the steady-state value of the number of trucks in the station?a.0.60b.0.16c.1.7d.2.5
Leave a Reply